FES winter maintenance vehicles are taking a break

Mild temperatures mark the official end of the winter maintenance season on 31 March 2026

The 2025/2026 winter service season was a tough one. 12 centimetres of snow (the most since 2013), ice and freezing rain – the winter service staff at FES Frankfurter Entsorgungs- und Service GmbH were called out significantly more often this season than in the previous one. In total, the teams were deployed for 23 full operations and five partial operations. In the previous winter maintenance season, there were four full operations and 13 partial operations.

A partial deployment refers to situations where snow and ice occur in a limited area within part of the city, or at specific locations across the city where ice is a concern, but not across the entire area. A full deployment covers the entire operational area.

During the season now drawing to a close, 2,771 tonnes of salt, 1,367,738 litres of brine, 1,035 tonnes of salt-gravel mixture and 8.2 tonnes of ‘Schnee- und Eisfrei’ were used. ‘Schnee- und Eisfrei’ is a mixture used primarily on bridges that does not damage the structure.   

FES Winter Service Manager Christoph Rembow is satisfied with the season that is drawing to a close: “When using gritting materials, our aim is to use as little as possible and only as much as necessary. Sometimes the weather conditions change within a matter of hours. Nevertheless, we always do our utmost to ensure that residents reach their destinations safely.”

FES winter service at the cutting edge of technology

For the first time this season, a gritting vehicle was deployed that can apply not only a mixture of salt and brine (FS30) but also pure brine (FS100). With this dual-system setup, the FES winter service is prepared for all weather conditions and contributes to environmental protection. Pure brine can be used in the event of black ice and freezing wet conditions, as well as for preventive operations. At the same time, the correct amount of road salt can be spread in combination with brine during snowfall. In total, the setup has a capacity of six tonnes of salt and 2,200 litres of brine. The trial was successful – six more of these combination gritting vehicles are set to follow before the end of this year.